• INTRODUCTION
    • 1.1  

      Introduction
    • 1.2  

      The Mining Act Awareness Program (MAAP)
    • 1.3  

      The Mining Sequence and MAAP
    • 1.4  

      Moving Through The Modules
  • BEFORE REGISTERING A MINING CLAIM
    • 2.1  

      Before Registering a Mining Claim - Terms
    • 2.2  

      Before Registering a Mining Claim (continued)
    • 2.3  

      What is The MLAS Map Viewer
    • 2.4  

      What is Crown Land
    • 2.5  

      Other Interests and Uses of Crown Land
    • 2.6  

      Lands That Have Been Withdrawn from Registration
    • 2.7  

      Other Interests Which May Influence Planning For Prospecting and Registration
    • 2.8  

      First Nation and Métis Communities - Aboriginal and Treaty Rights
    • 2.9  

      Before Registering a Mining Claim - Review
  • REGISTERING A MINING CLAIM
    • 3.1  

      Registering a Mining Claim - Terms
    • 3.2  

      Registering a Mining Claim
    • 3.3  

      How to Register a Mining Claim in Ontario
    • 3.4  

      Single-Cell and Multi-Cell Claims
    • 3.5  

      Confirmation of Mining Claim Registration to Surface Rights Owner
    • 3.6  

      Registering a Mining Claim - Review
  • PERFORMING WORK ON MINING LANDS - EARLY EXPLORATION ACTIVITIES
    • 4.5  

      Exploration Plans
    • 4.1  

      Performing Work on Mining Lands - Early Exploration Activities - Terms
    • 4.2  

      Performing Work on Mining Lands - Early Exploration Activities
    • 4.3  

      Exploration Plans and Exploration Permits - Process and Requirements
    • 4.4  

      The Duty to Consult with Aboriginal Communities
    • 4.6  

      Comments on Exploration Plans
    • 4.7  

      Exploration Permits
    • 4.8  

      Comments on Exploration Permit Applications
    • 4.9  

      Director's Discretion to Require an Exploration Permit
    • 4.10  

      Conditions Applicable to the Performance of Early Exploration Activities
    • 4.11  

      Performing Work on Mining Lands - Early Exploration Activities - Review
  • KEEPING A MINING CLAIM IN GOOD STANDING - ASSESSMENT WORK
    • 5.1  

      Keeping a Mining Claim in Good Standing - Assessment Work - Terms
    • 5.2  

      Keeping a Mining Claim in Good Standing - Assessment Work
    • 5.3  

      Required Units of Assessment Work
    • 5.4  

      How to Submit an Assessment Work Report
    • 5.5  

      Pending Distributions
    • 5.6  

      Distribution of Approved Credits
    • 5.7  

      Maximum Allocation From Mining Claims
    • 5.8  

      Alternatives to Performing Assessment Work
    • 5.9  

      Extensions and Exclusions of Time
    • 5.10  

      Keeping a Mining Claim in Good Standing - Assessment Work - Review
  • ADVANCING THROUGH THE MINING SEQUENCE
    • 6.1  

      Advancing Through The Mining Sequence
    • 6.2  

      Advanced Exploration/Mine Development and Production
    • 6.3  

      Advancing Through The Mining Sequence - Review
  • COMPLETE MAAP
    • 7.1  

      Record Completion of MAAP

Exploration Permits

Exploration permits are required for early exploration activities that generally have a potential for low to moderate impact and presence on-the-ground. Activities requiring an exploration permit include:

  • Line cutting that is a width greater than 1.5m;
  • Mechanized stripping of a total surface area greater than 100m² within a 200m radius and below advanced exploration threshold;
  • Pitting and trenching of bedrock material more than 3m³ in volume, within a 200m radius and below the advanced exploration threshold; and
  • Mechanized drilling where the drill is more than 150kg.

Applying for an Exploration Permit

A mining lands holder or authorized agent can submit an exploration permit application by selecting “Submit Plan/Permit for Early Exploration Activities” from the Early Exploration Activities tab in MLAS.

Please refer to the MNDM directives for instructions for how to submit Exploration Permit Applications in MLAS, and to the Mining Act, its regulations, policies, and How To Guides for more information.

When applying for an exploration permit:

The proponent will...

  • Identify and provide the exploration permit application to the appropriate surface rights owner(s) and submit the exploration permit application to MNDM.

MNDM will...

  • Circulate the exploration permit application to Aboriginal communities whose Aboriginal and/or treaty rights have the potential to be adversely affected by the proposed early exploration activity;
  • Post a proposal to issue an exploration permit to the Environmental Registry for 30 days during which time the public may also comment on the application; and
  • Carry out the Aboriginal consultation with the identified communities as may be appropriate.